The images show the project of the Stuttgart Hospital in Stuttgart, Germany. The hospital has 2,000 beds and occupies an area of 93,000 m².
NOEtop Wall Formwork systems were used in the project. The images show the formwork used during construction.
ESDESCON LLC represents Germany`s NOE, which has been manufacturing formwork products since the 1950s, in Azerbaijan. These systems are used in the construction of buildings and other similar structures, bridges, and tunnels.






