{description} page background image

The NOE company, we represent in Azerbaijan, has been manufacturing formwork since the 1950s. The images show a project of the Branich tunnel in Schriesheim, Germany. The tunnel length is 1796 m. NOE supplied formwork for the tunnel construction.

NOE products used in that project:

  • NOEtec deck formwork – 10 m long, 9.6 m wide, and 6 m high. It has a load-bearing capacity of 60 tons.
  • NOEtex Reinforcement – 10 m long, 14 m wide, and 9 m high.
  • NOEtop
  • NOE H20 wooden beam (support)
  • NOE LS200 

  • Along with the formwork function, NOE systems perform 2 other key functions. When urgent work is required in any area during laying formwork and concreting, the supporting carriage is not completely dismantled. The top platform of the supporting carriage can be lowered, and the central platform can be folded to the sides. As a result, additional space is created, allowing work to continue and saving time.


Do you have any questions for us?

Submit your inquiry

If you wish to use our professional services, please leave your contact details, and we will call you back!