Project: Smart Stay Cable Upgrade for the Guadiana Bridge
The Guadiana International Bridge, spanning 666m with a 324m central span, connects Spain and Portugal. After multiple strand failures, inspections in 2018 confirmed the need for a full stay cable system replacement.
DYWIDAG’s Role:
With completion in April 2021, the bridge is now safer, stronger, and equipped with smart monitoring technology.
The Guadiana International Bridge, spanning 666m with a 324m central span, connects Spain and Portugal. After multiple strand failures, inspections in 2018 confirmed the need for a full stay cable system replacement.
DYWIDAG’s Role:
- Inspection & testing (June – Aug 2018)
- Stay cable replacement (Nov 2019 – Apr 2021)
With completion in April 2021, the bridge is now safer, stronger, and equipped with smart monitoring technology.



