The NOE company, we represent in Azerbaijan, has been manufacturing formwork since the 1950s. The images show a project of the Branich tunnel in Schriesheim, Germany. The tunnel length is 1796 m. NOE supplied formwork for the tunnel construction.


NOE products used in that project:
1. NOEtec boarding formwork – length 10 m, width 9.6 m, height 6 m. Load capacity 60 tons.
2. NOEtex reinforcement – length 10 m, width 14 m, height 9 m.
3. NOEtop
4. Wooden beams NOE H20 (supporting)
5. NOE LS200


Along with the formwork function, NOE systems perform 2 other key functions. When urgent work is required in any area during laying formwork and concreting, the supporting carriage is not completely dismantled. The top platform of the supporting carriage can be lowered, and the central platform can be folded to the sides. As a result, additional space is created, allowing work to continue and saving time.