{description} page background image
One of MAURER's global references is the Gazprom Arena. MAURER offers seismic isolation solutions for all types of structures, including residential buildings and towers. This stadium is one of such projects.

The Gazprom Arena is located in St. Petersburg, Russia. Construction was completed in April 2017. The stadium has a capacity of 67,800 spectators. The architect of the building is Kisho Kurokawa from Japan. The total cost of the Gazprom Arena project is EUR 597 million.

MAURER's main focus in this project was on creating a protection system for the structure. To achieve this, MAURER used more than 100 structural bearings manufactured using high-quality MSM technology. These bearings withstand vertical loads up to 10,000 kN and have a lifting capacity of up to 3.5 MN. As seen in the construction images, there are 8 pylons at the edges. These 8 pylons connect the entire structure, and the bearings are installed in their base points. Thanks to the bearings, the arising movements are transmitted to the appropriate supports. Here, the high-quality sliding MSM technology by MAURER plays a significant role.


Do you have any questions for us?

Submit your inquiry

If you wish to use our professional services, please leave your contact details, and we will call you back!